Rata Road, Devonport
Completion 2010
Works include bulk excavation, dewatering to keep tidal flow below excavation, retention piling to site perimeter and hard landscaping.

O & I Glass Factory, Penrose
Completion 2010
Works includes drainage to the Cold End Store Stage 1 and 1A and drainage to the  Furnace and Lehr Building.

Starship Hospital Carpark
Completed 2009
An extension to the existing carparking building. Harbour Civil carried out the bulk excavation of 1,000m3, detailed excavation, carpark, asphalting and kerbing.

Westfield Albany Carpark
Completed 2008
New 2,600m2 carpark facility for staff parking.

Kensington Park
Completed 2008
A masterplanned community, comprising of standalone homes and terraced apartments located in Orewa, Auckland. Harbour Civil carried out detailed excavation, building platform, under slab preparation and subsoil drainage to apartment structures, SeaView home excavation, drilled piles, decant drains, silt retention ponds and temporary haul roads.

Lucerne Road Residential Home
Completed 2008
Earthworks for this multi-million dollar home in Remuera included 1,500m3 bulk excavation and 32 concrete piles.

Point Ridge Stage 3
Completed 2007
Earthworks for this high end residential resort in Albany, Auckland included bulk excavation, detailed excavation, under slab preparation and driveway preparation.